Gaza Authorities Say Only Power Plant on Brink of Shutdown

Gaza Authorities Say Only Power Plant on Brink of Shutdown

February 5, 2010 /EIN PRESSWIRE/ The Gaza Energy Authority said that if no fuel is received, the only power plant in Gaza will be shut down Friday night, according to The Siasat Daily.

The plant stopped serving power to more than 60% of the coastal strip on Thursday. A cold front that swept through the region forced the Gaza Energy Authority to use its remaining fuel faster than expected, the authority said. Palestinian liaison officer Raed Fattough said fuel for the plant is purchased from and delivered by Israel, but Israeli authorities stopped fuel trucks from entering Gaza.

Kan’an Obeid, deputy manager of the Energy Authority in the Gaza Strip noted that an EU contract paying for fuel shipments expired in late November, and EU officials recently stated they would no longer pay for the shipments unless the Palestinian Authority drafted a new agreement and payment scheme.

about this story at Power Plant News Today:

Latest Palestine Power Plants news – http://powerplants.einnews.com/palestine/
Latest Israel Power Plants news – http://powerplants.einnews.com/israel/

Located at http://powerplants.einnews.com, Power Plant News Today is a service of , an industry leader in news monitoring for business professionals and analysts. Using a combination of proprietary search technology and human editing, delivers to its members the latest power plant news from around the world, saving them valuable time they’d spend searching for information. New users to Power Plant News Today can enjoy a no-obligation, one-week free trial.

About EIN Presswire
The EIN Presswire press release distribution service is a news-syndication solution that distributes news to more than 10 million visitors annually at and millions more through its press release distribution partners. A news source for leading journalists, decision-makers and industry professionals worldwide, EIN Presswire targets press releases to a wide array of worldwide business professionals in more than 80 different industries. EIN Presswire also offers affiliate network opportunities and news distribution to tens of thousands of news subscribers daily. Read the newest business news at http://www.einpresswire.com and the latest world news in more than 80 different industries at http://www.einnews.com.

  • Blogger Post
  • Delicious
  • Facebook
  • Yahoo Bookmarks
  • Technorati Favorites
  • StumbleUpon
  • Yahoo Buzz
  • Digg
  • MySpace
  • Yahoo Mail
  • Windows Live Favorites
  • Yahoo Messenger
  • Windows Live Spaces
  • Google Bookmarks
  • Reddit
  • Twitter
  • HelloTxt
  • LinkedIn
  • Share/Bookmark

Related posts:

  1. Natural Gas Blamed for Connecticut Power Plant Explosion February 8, 2010 /EIN PRESSWIRE/ According to the AP, the explosion at the Kleen Energy Systems power plant in Connecticut occurred as workers purged natural gas lines. At least five people have been killed...
  2. Slovakian Authorities Plant Explosives Material In Passenger’s Bag, Which Makes Its Way To Ireland; Follow Airport Privacy Issues At Airline Industry Today Slovakian Authorities Plant Explosives Material In Passenger’s Bag, Which Makes Its Way To Ireland; Follow Airport Privacy Issues At Airline Industry Today January 7, 2010 /EIN PRESSWIRE/ Slovakian authorities planted explosives material in the bag...
  3. South Korea Making Major Nuclear Power Plant Push in Middle East South Korea Making Major Nuclear Power Plant Push in Middle East January 18, 2010 /EIN PRESSWIRE/ South Korea and its corporations are making major inroads in the Middle East to build nuclear power plants in...
  4. BrightSource Granted $1.4 Billion Loan for Mojave Solar Energy Project February 23, 2010 /EIN PRESSWIRE/ California solar energy giant BrightSource has been conditionally granted a $1.4 billion stimulus loan from the US government to build a nearly 400-megawatt solar power complex in the Mojave Desert....
  5. Colorado Geothermal Land Lease Delayed for Third Time Colorado Geothermal Land Lease Delayed for Third Time February 9, 2010 /EIN PRESSWIRE/ The Obama administration may desire to invest more in Geothermal energy, but the regulatory hurdles, lack of education about geothermal power and...

Tags: , , , , , , , , ,

Comments are closed.

Search engine optimization by SEO Design Solutions

UA-2539665-2